Luke Parmenter

Work

  1. The completed extension, 2025 An-Garrek Bungalow remodel and extension A bungalow in St Minver reworked and extended, taken from planning through to a full Building Regulations package. Now built. St Minver, Cornwall
    2023 to 2025, RIBA stage 1 to 4, built
  2. Plot 7 mezzanine with glass balustrade, on completion Manor Farm Barns Listed barn conversion, interiors Three Grade II listed oak-framed barns converted into eight homes. I was on site, designing and procuring the interiors. Greywell, Hampshire
    2015 to 2017, RIBA stage 4 to 5, on site
  3. The finished bridge, summer 2023 The Rain Bridge Design and build, timber footbridge A covered timber footbridge at the Centre for Alternative Technology, designed and built by hand by five MArch students. CAT, Machynlleth, Powys
    2022 to 2023, RIBA stage 2 to 5, built
  4. Visual of the proposed house Aral Farm Off-grid straw bale house An off-grid straw bale home on a working farm, designed under Cornwall’s low impact Policy AL1. Currently in planning. St Columb, Cornwall
    2025 to 2026, RIBA stage 3, in planning
  5. A more equitable model for tourism in Cornwall? Second Home MArch thesis, community co-hotel Can tourism in Cornwall work for the people who live here? A disused clifftop hotel reused as a community owned co-hotel and workspace. Port Gaverne, North Cornwall
    2022 to 2023, RIBA stage 2 to 4, academic