Skip to content
Work
-
An-Garrek
Bungalow remodel and extension
A bungalow in St Minver reworked and extended, taken from planning through to a full Building Regulations package. Now built.
St Minver, Cornwall
2023 to 2025, RIBA stage 1 to 4, built
-
Manor Farm Barns
Listed barn conversion, interiors
Three Grade II listed oak-framed barns converted into eight homes. I was on site, designing and procuring the interiors.
Greywell, Hampshire
2015 to 2017, RIBA stage 4 to 5, on site
-
The Rain Bridge
Design and build, timber footbridge
A covered timber footbridge at the Centre for Alternative Technology, designed and built by hand by five MArch students.
CAT, Machynlleth, Powys
2022 to 2023, RIBA stage 2 to 5, built
-
Aral Farm
Off-grid straw bale house
An off-grid straw bale home on a working farm, designed under Cornwall’s low impact Policy AL1. Currently in planning.
St Columb, Cornwall
2025 to 2026, RIBA stage 3, in planning
-
Second Home
MArch thesis, community co-hotel
Can tourism in Cornwall work for the people who live here? A disused clifftop hotel reused as a community owned co-hotel and workspace.
Port Gaverne, North Cornwall
2022 to 2023, RIBA stage 2 to 4, academic